Project Risk vs Contingency
PMBOK-aligned risk register with Before/After mitigation scoring, cost impact tracking, and live contingency coverage analysis.
Total Cost Before Mitigation
$0
Gross exposure
Mitigation Cost
$0
Cost to mitigate
Residual Cost After Mitigation
$0
Remaining exposure
Contingency Budget
$100,000
β
Residual exposure: $0
Budget available: $100,000
Add your project risks below to see contingency analysis.
Low (1β4)
Medium (5β9)
High (10β16)
Extreme (17β25)
Score = Likelihood Γ Impact (1β5 scale)
Top 5 Critical Risks (After Mitigation)
Severity Distribution (After Mitigation)
Residual Risk Heatmap (Likelihood vs Impact β After Mitigation)
Likelihood Scale (1β5)
1Rare β Highly unlikely; may happen only in exceptional circumstances
2Unlikely β Could occur at some time but not expected
3Possible β Might occur at some time
4Likely β Will probably occur in most circumstances
5Almost Certain β Expected to occur in most cases
Impact Scale (1β5)
1Negligible β Minimal impact; easily managed within team
2Minor β Small impact; some rework or minor cost/schedule deviation
3Moderate β Manageable impact; requires approval at project level
4Major β Significant impact; threatens key objectives; senior management attention
5Severe/Critical β Project viability threatened; major cost/schedule/scope overrun
Risk Score Matrix (Likelihood Γ Impact) β Before Mitigation